Before we leave for the Easter break, we wanted to show the next segment of our video from December showing the assembly and installation of structural “trees”.
This second video, shot over the past few weeks, reveals the culmination of our structural strategy with the installation of a steel truss “canopy” measuring up to 138′ in length above the Longueuil-Université-de-Sherbrooke metro terminal tunnel.
Congratulations to the whole team for this titanic task!
See more information about the project.