As our partners have been at the forefront of management, coordination, logistics and production processes via BIM (since 2005), we continue to innovate in the matter to the benefit of the projects we work on.
Our models can easily be interconnected with that of the architect and other professionals, allowing real-time coordination. Our modelling methodology also allows us to go beyond solving coordination problems and producing quantity takeoffs. Our calculation tools are connected to the graphical model, reducing the integration time from design to plans and production times. In fact, from a structure perspective, cost-analysis, optimization and site scheduling components are only some of the parameters that can be incorporated into our models.
Once the project’s construction phase is completed, our structural BIM model provides our clients with a fully updated project in regards to site modifications and a long-term facilities management tool when combined with those from the architects and the mechanical-electrical engineers.