• Date : May 30, 2019
  • Share :

Here is a series of photos showing the assembly of the three levels of steel structures that will be used to support the 9 additional concrete floors of the “Hotel” portion of the Humaniti project, acting as a “bridge” between the office and condo volumes.

The “bridge” has a span of 85′ and a width of 56′.

To consult the complete photo album…

For more information about structural challenges…