• Date : September 20, 2018
  • Share :

These two photos illustrate the temporary under-pinning strategy we used to support the existing 10 floors of the building. The first shows the steel tripod at the base of the columns before excavation. The second picture shows the footings of columns that were demolished and the subsequent excavation beneath them.

 

For more information about this project…